Contratos y diseños Industriales S.A has successfully completed a new caustic soda plant. The scope of this project has been the design, manufacture and assembly of the metallic structure as well as the mechanical assembly of all equipment, pipes and thermal insulation. The approximate duration of the assembly has been 6 months.
Dec
30